Substation Scout

Hickory 230 kV

PJM queue ID C01-1366

Hickory 230 kV (C01-1366) is listed in the PJM interconnection queue as a 120 MW battery project in Chesapeake County, VA. The filing names Hickory as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 15, 2031.

Queue IDC01-1366
Project nameHickory 230 kV
Status (as published)Active
SubstationHickory
Point of interconnectionHickory 230 kV
CountyChesapeake
StateVA
Voltage230 kV
Capacity120 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2031-09-15
Source datasetcycle

Same substation and county

Hickory substation: 9 requests in the PJM queue, 1 active totaling 120 MW.

Queue IDProjectMWResourceStatus
AG1-383Hickory 34.5 kV15.4HybridWithdrawn
AD2-186Hickory 34.5 kV14.4SolarWithdrawn
AA2-180Chesapeake Solar14SolarWithdrawn
AE1-027Hickory Solar13.1SolarWithdrawn
AC1-047TWE Chesapeake Solar12.9SolarWithdrawn
AD2-187Hickory 34.5 kV8.6SolarWithdrawn
AE1-028Hickory Solar7.6SolarWithdrawn
AD1-159Hickory 34.5 kV7.2SolarWithdrawn

Chesapeake, VA: 5 requests in the PJM queue, 5 active totaling 995 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperLa Feria Energy Storage, LLC
Transmission ownerDominion
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy120.0
MW capacity120.0
MFO120.0
Submitted date4/27/2026
Last updated6/9/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first