Scioto Solar (AE2-306) is listed in the PJM interconnection queue as a 18 MW solar project in Hardin County, OH. The filing names Gunn Road as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of December 28, 2026.

Queue IDAE2-306
Project nameScioto Solar
Status (as published)Partially in Service - Under Construction
SubstationGunn Road
Point of interconnectionGunn Road 345 kV
CountyHardin
StateOH
Voltage345 kV
Capacity18 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-12-28
Source datasetserial

Same substation and county

Gunn Road substation: 4 requests in the PJM queue, 2 active totaling 74 MW.

Queue IDProjectMWResourceStatus
AF1-285Scioto Solar56HybridPartially in Service - Under Construction
AI2-452Gunn Road 345 kV51.8SolarWithdrawn
AC2-124Gunn Road 345kV19SolarWithdrawn

Hardin, OH: 39 requests in the PJM queue, 18 active totaling 715 MW.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-02 Status change n/a Under Construction → Partially in Service - Under Construction

Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy30
MW capacity18
MFO30

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first