Scioto Solar
PJM queue ID AF1-285
Scioto Solar (AF1-285) is listed in the PJM interconnection queue as a 56 MW hybrid project in Hardin County, OH. The filing names Gunn Road as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of December 31, 2026.
| Queue ID | AF1-285 |
|---|---|
| Project name | Scioto Solar |
| Status (as published) | Partially in Service - Under Construction |
| Substation | Gunn Road |
| Point of interconnection | Gunn Road 345 kV |
| County | Hardin |
| State | OH |
| Voltage | 345 kV |
| Capacity | 56 MW |
| Resource (as published) | Solar; Storage |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2026-12-31 |
| Source dataset | serial |
Same substation and county
Gunn Road substation: 4 requests in the PJM queue, 2 active totaling 74 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AE2-306 | Scioto Solar | 18 | Solar | Partially in Service - Under Construction |
| AI2-452 | Gunn Road 345 kV | 51.8 | Solar | Withdrawn |
| AC2-124 | Gunn Road 345kV | 19 | Solar | Withdrawn |
Hardin, OH: 39 requests in the PJM queue, 18 active totaling 715 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-02 | Status change | n/a | Under Construction → Partially in Service - Under Construction |
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 100 |
| MW capacity | 56 |
| MFO | 130 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.