Greenland Gap substation interconnection queue

3 active projects totalling 185.6 MW in the PJM queue, plus 2 with terminal status (shown greyed).

3active projects
185.6active MW
5total filed
Queue IDProjectkVMWResourceStatus
AI1-202 Greenland Gap 500 kV 500 450 Hybrid Withdrawn
C01-1806 Greenland Gap 500 kV 500 125.6 Wind Active
AI2-355 Greenland Gap 500 kV 500 103.8 Wind Withdrawn
K11 Greenland Gap WF 500 60 Wind In Service
H21_W68 Greenland Gap WF 500 0 Wind In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.