Substation Scout

Greenland Gap substation interconnection queue

3 active projects totaling 185.6 MW in the PJM queue, plus 2 with terminal status (shown grayed).

5 PJM queue filings name Greenland Gap as the point of interconnection, all in Grant County, WV.

Target commercial operation dates as filed run from Sep 2007 to Jun 2028 (5 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: APS (1 filing).

3active projects
185.6active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI1-202 Greenland Gap 500 kV 500 450 Hybrid Withdrawn Oct 2026
C01-1806 Greenland Gap 500 kV 500 125.6 Wind Active Jun 2028
AI2-355 Greenland Gap 500 kV 500 103.8 Wind Withdrawn Apr 2023
K11 Greenland Gap WF 500 60 Wind In Service Oct 2007
H21_W68 Greenland Gap WF 500 0 Wind In Service Sep 2007

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Grant County, WV

All 34 PJM queue filings in Grant County, WV.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first