Greenland Gap substation interconnection queue
3 active projects totaling 185.6 MW in the PJM queue, plus 2 with terminal status (shown grayed).
5 PJM queue filings name Greenland Gap as the point of interconnection, all in Grant County, WV.
Target commercial operation dates as filed run from Sep 2007 to Jun 2028 (5 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: APS (1 filing).
3active projects
185.6active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI1-202 | Greenland Gap 500 kV | 500 | 450 | Hybrid | Withdrawn | Oct 2026 |
| C01-1806 | Greenland Gap 500 kV | 500 | 125.6 | Wind | Active | Jun 2028 |
| AI2-355 | Greenland Gap 500 kV | 500 | 103.8 | Wind | Withdrawn | Apr 2023 |
| K11 | Greenland Gap WF | 500 | 60 | Wind | In Service | Oct 2007 |
| H21_W68 | Greenland Gap WF | 500 | 0 | Wind | In Service | Sep 2007 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Grant County, WV
- Mount Storm - Valley: 2 active, 2,990 MW of 2 filed
- Mount Storm: 3 active, 550 MW of 5 filed
- William: 2 active, 80.3 MW of 5 filed
- Greenland Gap II: 1 active, 36.5 MW of 2 filed
- Mt. Storm: 1 active, 14 MW of 4 filed
- Cherry Ridge: none active of 3 filed
- Henry: none active of 3 filed
- Williams: none active of 3 filed