Substation Scout

Greenland Gap WF

PJM queue ID H21_W68

Greenland Gap WF (H21_W68) is listed in the PJM interconnection queue as a wind request filed at 0 MW (a net change or energy-only filing) in Grant County, WV. The filing names Greenland Gap as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 25, 2007.

Queue IDH21_W68
Project nameGreenland Gap WF
Status (as published)In Service
SubstationGreenland Gap
Point of interconnectionGreenland Gap 500kV
CountyGrant
StateWV
Voltage500 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2007-09-25
Source datasetserial

Same substation and county

Greenland Gap substation: 5 requests in the PJM queue, 3 active totaling 185.6 MW.

Queue IDProjectMWResourceStatus
C01-1806Greenland Gap 500 kV125.6WindActive
K11Greenland Gap WF60WindIn Service
AI1-202Greenland Gap 500 kV450HybridWithdrawn
AI2-355Greenland Gap 500 kV103.8WindWithdrawn

Grant, WV: 34 requests in the PJM queue, 11 active totaling 3,797.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy300
MW capacity0
MFO300

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.