Greenland Gap WF
PJM queue ID H21_W68
Greenland Gap WF (H21_W68) is listed in the PJM interconnection queue as a wind request filed at 0 MW (a net change or energy-only filing) in Grant County, WV. The filing names Greenland Gap as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 25, 2007.
| Queue ID | H21_W68 |
|---|---|
| Project name | Greenland Gap WF |
| Status (as published) | In Service |
| Substation | Greenland Gap |
| Point of interconnection | Greenland Gap 500kV |
| County | Grant |
| State | WV |
| Voltage | 500 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2007-09-25 |
| Source dataset | serial |
Same substation and county
Greenland Gap substation: 5 requests in the PJM queue, 3 active totaling 185.6 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1806 | Greenland Gap 500 kV | 125.6 | Wind | Active |
| K11 | Greenland Gap WF | 60 | Wind | In Service |
| AI1-202 | Greenland Gap 500 kV | 450 | Hybrid | Withdrawn |
| AI2-355 | Greenland Gap 500 kV | 103.8 | Wind | Withdrawn |
Grant, WV: 34 requests in the PJM queue, 11 active totaling 3,797.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 300 |
| MW capacity | 0 |
| MFO | 300 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.