Mount Storm substation interconnection queue
3 active projects totaling 550 MW in the PJM queue, plus 2 with terminal status (shown grayed).
5 PJM queue filings name Mount Storm as the point of interconnection, all in Grant County, WV.
Target commercial operation dates as filed run from Jun 2011 to Dec 2030 (5 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dominion (1 filing).
3active projects
550active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1758 | Mount Storm 500 kV | 500 | 500 | Battery | Active | Dec 2030 |
| X4-022 | Mount Storm 230kV | 230 | 358 | Not reported | Withdrawn | Jun 2012 |
| S75 | Mount Storm Unit 3 | 500 | 29 | Coal | Withdrawn | Jun 2012 |
| S74 | Mount Storm Unit 2 | 500 | 25 | Coal | In Service | Jun 2011 |
| S76 | Mount Storm Unit 1 | 500 | 25 | Coal | In Service | Jun 2013 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Grant County, WV
- Mount Storm - Valley: 2 active, 2,990 MW of 2 filed
- Greenland Gap: 3 active, 185.6 MW of 5 filed
- William: 2 active, 80.3 MW of 5 filed
- Greenland Gap II: 1 active, 36.5 MW of 2 filed
- Mt. Storm: 1 active, 14 MW of 4 filed
- Cherry Ridge: none active of 3 filed
- Henry: none active of 3 filed
- Williams: none active of 3 filed
Site Scanner