Greenland Gap 500 kV
PJM queue ID C01-1806
Greenland Gap 500 kV (C01-1806) is listed in the PJM interconnection queue as a 125.6 MW wind project in Grant County, WV. The filing names Greenland Gap as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2028.
| Queue ID | C01-1806 |
|---|---|
| Project name | Greenland Gap 500 kV |
| Status (as published) | Active |
| Substation | Greenland Gap |
| Point of interconnection | Greenland Gap 500 kV |
| County | Grant |
| State | WV |
| Voltage | 500 kV |
| Capacity | 125.6 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2028-06-01 |
| Source dataset | cycle |
Same substation and county
Greenland Gap substation: 5 requests in the PJM queue, 3 active totaling 185.6 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| K11 | Greenland Gap WF | 60 | Wind | In Service |
| H21_W68 | Greenland Gap WF | 0 | Wind | In Service |
| AI1-202 | Greenland Gap 500 kV | 450 | Hybrid | Withdrawn |
| AI2-355 | Greenland Gap 500 kV | 103.8 | Wind | Withdrawn |
Grant, WV: 34 requests in the PJM queue, 11 active totaling 3,797.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Mount Storm Wind LLC |
|---|---|
| Transmission owner | APS |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 0.0 |
| MW capacity | 125.6 |
| MFO | 300.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/23/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.