Mt. Storm substation interconnection queue

1 active project totalling 14 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
14active MW
4total filed
Queue IDProjectkVMWResourceStatus
AI2-187 Mt. Storm 500kV 500 445 Hybrid Withdrawn
X2-086 Mt. Storm 115kV 115 74 Coal Withdrawn
AH1-713 Mt. Storm 500kV 500 14 Coal Active
P45B Mt. Storm 500kV 500 0 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.