William substation interconnection queue
2 active projects totaling 80.3 MW in the PJM queue, plus 3 with terminal status (shown grayed).
5 PJM queue filings name William as the point of interconnection, all in WV.
Target commercial operation dates as filed run from Dec 2012 to Jun 2028 (5 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: APS (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1733 | William 138 kV | 138 | 58.7 | Wind | Active | Jun 2028 |
| AG2-062 | Catamount Wind | 138 | 21.6 | Wind | Active | Sep 2027 |
| X3-036 | William 138kV | 138 | 19.5 | Wind | Withdrawn | Dec 2012 |
| AE1-052 | Backbone Mountain Windpower | 138 | 10 | Battery | Withdrawn | Sep 2024 |
| AG1-112 | William 138 kV | 138 | 10 | Battery | Withdrawn | Nov 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: William (APS, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Tucker County, WV
- Backbone Mountain: 2 active, 36 MW of 4 filed
Other PJM queue substations in Grant County, WV
- Mount Storm - Valley: 2 active, 2,990 MW of 2 filed
- Mount Storm: 3 active, 550 MW of 5 filed
- Greenland Gap: 3 active, 185.6 MW of 5 filed
- Greenland Gap II: 1 active, 36.5 MW of 2 filed
- Mt. Storm: 1 active, 14 MW of 4 filed
- Cherry Ridge: none active of 3 filed
- Henry: none active of 3 filed
- Williams: none active of 3 filed