Greenland Gap II substation interconnection queue
1 active project totaling 36.5 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Greenland Gap II as the point of interconnection, all in Grant County, WV.
Target commercial operation dates as filed run from Jul 2027 to Nov 2028 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: APS (1 filing).
1active projects
36.5active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-356 | Greenland Gap 500 kV II | 500 | 57.2 | Wind | Withdrawn | Jul 2027 |
| AH1-254 | Mount Storm Repower | 500 | 36.5 | Wind | Active | Nov 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Grant County, WV
- Mount Storm - Valley: 2 active, 2,990 MW of 2 filed
- Mount Storm: 3 active, 550 MW of 5 filed
- Greenland Gap: 3 active, 185.6 MW of 5 filed
- William: 2 active, 80.3 MW of 5 filed
- Mt. Storm: 1 active, 14 MW of 4 filed
- Cherry Ridge: none active of 3 filed
- Henry: none active of 3 filed
- Williams: none active of 3 filed