Henry substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| H04_W64 | Henry 138 kV | 138 | 150 | Wind | Withdrawn |
| K24 | Henry 138kV | 138 | 30 | Wind | Withdrawn |
| M23 | Mt Storm WF | 138 | 30 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.