Substation Scout

Cherry Ridge substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH1-592 Messenger Brothers Storage 66 45 Battery Withdrawn
AH1-590 Messenger Brothers Solar I 66 30 Solar Withdrawn
AH1-591 Messenger Brothers Solar II 66 30 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.