Cherry Ridge substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Cherry Ridge as the point of interconnection, all in Grant County, WV.
Target commercial operation date as filed: Dec 2024 (3 filings).
Transmission owner as filed: APS (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-592 | Messenger Brothers Storage | 66 | 45 | Battery | Withdrawn | Dec 2024 |
| AH1-590 | Messenger Brothers Solar I | 66 | 30 | Solar | Withdrawn | Dec 2024 |
| AH1-591 | Messenger Brothers Solar II | 66 | 30 | Solar | Withdrawn | Dec 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Grant County, WV
- Mount Storm - Valley: 2 active, 2,990 MW of 2 filed
- Mount Storm: 3 active, 550 MW of 5 filed
- Greenland Gap: 3 active, 185.6 MW of 5 filed
- William: 2 active, 80.3 MW of 5 filed
- Greenland Gap II: 1 active, 36.5 MW of 2 filed
- Mt. Storm: 1 active, 14 MW of 4 filed
- Henry: none active of 3 filed
- Williams: none active of 3 filed