Greenland Gap WF

PJM queue ID K11

Greenland Gap WF (K11) is listed in the PJM interconnection queue as a 60 MW wind project in Grant County, WV. The filing names Greenland Gap as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 1, 2007.

Queue IDK11
Project nameGreenland Gap WF
Status (as published)In Service
SubstationGreenland Gap
Point of interconnectionGreenland Gap 500kV
CountyGrant
StateWV
Voltage500 kV
Capacity60 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2007-10-01
Source datasetserial

Same substation and county

Greenland Gap substation: 5 requests in the PJM queue, 3 active totaling 185.6 MW.

Queue IDProjectMWResourceStatus
C01-1806Greenland Gap 500 kV125.6WindActive
H21_W68Greenland Gap WF0WindIn Service
AI1-202Greenland Gap 500 kV450HybridWithdrawn
AI2-355Greenland Gap 500 kV103.8WindWithdrawn

Grant, WV: 34 requests in the PJM queue, 11 active totaling 3,797.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW capacity60
MFO300

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.