Substation Scout

Fentress

Named in 1 PJM planning document for 1 project, on October 6, 2026.

Existingdescribed as
DOMzone
—kV as printed
1mentions

PJM interconnection queue

A PJM queue substation page has the same name: Fentress (VA) — 4 queue requests filed, 0 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Baseline 500kV Line #588 Rebuild (End of Life Criteria)
b3850.1 – b3850.3
Not printed $113.8M 12/31/2026 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$79.7 M → $113.8M 2026-10-06 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Item 16 - Reliability Analysis Update - Presentation p. 6
Baseline 500kV Line #588 Rebuild (End of Life Criteria) “outside of Fentress substation”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this