Elizabeth River GT1
PJM queue ID S90
Elizabeth River GT1 (S90) is listed in the PJM interconnection queue as a 20 MW gas project in City of Chesapeake, VA. The filing names Elizabeth River as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2008.
| Queue ID | S90 |
|---|---|
| Project name | Elizabeth River GT1 |
| Status (as published) | In Service |
| Substation | Elizabeth River |
| Point of interconnection | Elizabeth River 230kV |
| County | City of Chesapeake |
| State | VA |
| Voltage | 230 kV |
| Capacity | 20 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2008-06-01 |
| Source dataset | serial |
Same substation and county
Elizabeth River substation: 3 requests in the PJM queue, 3 active totaling 60 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| S91 | Elizabeth River GT2 | 20 | Gas | In Service |
| S92 | Elizabeth River GT3 | 20 | Gas | In Service |
City of Chesapeake, VA: 50 requests in the PJM queue, 10 active totaling 1,016 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 20 |
| MFO | 125 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.