Staunton Solar

PJM queue ID AG1-342

Staunton Solar (AG1-342) is listed in the PJM interconnection queue as a 21.6 MW solar project in Halifax County, VA. The filing names Dryburg as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of May 31, 2030.

Queue IDAG1-342
Project nameStaunton Solar
Status (as published)EP
SubstationDryburg
Point of interconnectionDryburg 115 kV
CountyHalifax
StateVA
Voltage115 kV
Capacity21.6 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2030-05-31
Source datasetcycle

Same substation and county

Dryburg substation: 2 requests in the PJM queue, 2 active totaling 28.2 MW.

Queue IDProjectMWResourceStatus
AG2-262Dryburg 115 kV6.6SolarActive

Halifax, VA: 57 requests in the PJM queue, 25 active totaling 1,315.8 MW.

A substation with the same name is named in PJM transmission planning materials: Dryburg (DOM, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperStaunton Solar LLC
Transmission ownerDominion
Project typeGeneration Interconnection
CycleTC1
StageFINAL AGREEMENT
MW energy36.0
MW capacity21.6
MFO36.0
Submitted date9/30/2020
Last updated3/11/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.