McPherson, SD interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
T32 Collins n/r 925 Wind Withdrawn
T34 Collins III n/r 555 Wind Withdrawn
T33 Collins II n/r 370 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.