Collins 345 kV

PJM queue ID C01-1808

Collins 345 kV (C01-1808) is listed in the PJM interconnection queue as a 940 MW nuclear project in Grundy County, IL. The filing names Collins as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of May 1, 2036.

Queue IDC01-1808
Project nameCollins 345 kV
Status (as published)Active
SubstationCollins
Point of interconnectionCollins 345 kV
CountyGrundy
StateIL
Voltage345 kV
Capacity940 MW
Resource (as published)Nuclear
Resource categoryNuclear (normalized for filtering)
Target commercial operation2036-05-01
Source datasetcycle

Same substation and county

Collins substation: 8 requests in the PJM queue, 3 active totaling 1,140 MW.

Queue IDProjectMWResourceStatus
C01-1576Collins 345 kV150BatteryActive
C01-1577Collins 345 kV50BatteryActive
S57Collins1,500WindWithdrawn
AA2-035Collins1,019.3GasWithdrawn
T32Collins925WindWithdrawn
S58Collins0WindWithdrawn
U3-026Collins0WindWithdrawn

Grundy, IL: 44 requests in the PJM queue, 18 active totaling 3,015.2 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperNRG Tully Energy Center LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy940.0
MW capacity940.0
MFO940.0
Submitted date4/24/2026
Last updated8/4/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first