Substation Scout

Kent, MD interconnection queue

1 active project totalling 19.8 MW in the PJM queue, plus 15 with terminal status (shown greyed).

1active projects
19.8active MW
16total filed
Queue IDProjectkVMWResourceStatus
AB2-133 Morgnec Road Solar 69 19.8 Solar Partially in Service - Under Construction
AB2-183 Massey 25kV 25 14 Solar Withdrawn
Y3-033 Mills Branch Wind Farm 69 13 Wind Withdrawn
AB2-143 Lynch 25kV 25 7.6 Solar Withdrawn
W2-002 Kennedyville 1 69kV 69 7.6 Solar Withdrawn
W2-003 Kennedyville 2 69kV 69 7.6 Solar Withdrawn
Z2-096 Lynch West 25kV 25 7.1 Solar Withdrawn
X3-074 Chestertown 69kV 69 4.5 Solar Withdrawn
Z2-074 Chestertown East 25kV 25 4 Solar Withdrawn
AA1-110 Blue Star Solar Project 25 4 Solar Withdrawn
X3-073 Massey 69kV 69 3.7 Solar Withdrawn
Z2-075 Lynch East 25kV 25 3.7 Solar Withdrawn
Z2-097 Church 25 3.5 Solar Withdrawn
Z2-073 Chestertown West 25kV 25 3.4 Solar Withdrawn
AB1-183 Kennedyville-Massey 69kV 69 0 Solar Withdrawn
Y1-014 Worton 12kV 12 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.