Massey substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AB2-183 Massey 25kV 25 14 Solar Withdrawn
AA1-110 Blue Star Solar Project 25 4 Solar Withdrawn
X3-073 Massey 69kV 69 3.7 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.