Morgnec Road Solar (AB2-133) is listed in the PJM interconnection queue as a 19.8 MW solar project in Kent County, MD. The filing names Chestertown as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 31, 2026.
| Queue ID | AB2-133 |
|---|---|
| Project name | Morgnec Road Solar |
| Status (as published) | In Service |
| Substation | Chestertown |
| Point of interconnection | Chestertown 69kV |
| County | Kent |
| State | MD |
| Voltage | 69 kV |
| Capacity | 19.8 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-07-31 |
| Source dataset | serial |
Same substation and county
Chestertown substation: 3 requests in the PJM queue, 1 active totaling 19.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AB1-133 | Chestertown 69kV | 14 | Solar | Withdrawn |
| X3-074 | Chestertown 69kV | 4.5 | Solar | Withdrawn |
Kent, MD: 16 requests in the PJM queue, 1 active totaling 19.8 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Status change | n/a | Partially in Service - Under Construction → In Service |
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 45 |
| MW capacity | 19.8 |
| MFO | 45 |