Brunswick Combined Cycle Power Station

PJM queue ID X2-076

Brunswick Combined Cycle Power Station (X2-076) is listed in the PJM interconnection queue as a 1,376 MW gas project in Brunswick County, VA. The filing names Carson-Wake as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of May 1, 2016.

Queue IDX2-076
Project nameBrunswick Combined Cycle Power Station
Status (as published)In Service
SubstationCarson-Wake
Point of interconnectionCarson-Wake 500kV
CountyBrunswick
StateVA
Voltage500 kV
Capacity1,376 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2016-05-01
Source datasetserial

Same substation and county

Carson-Wake substation: 3 requests in the PJM queue, 1 active totaling 1,376 MW.

Queue IDProjectMWResourceStatus
AA1-064Carson-Wake 500kV56SolarWithdrawn
AI2-280Carson-Wake 500kV34GasWithdrawn

Brunswick, VA: 45 requests in the PJM queue, 18 active totaling 2,685.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy1525.5
MW capacity1376
MFO1525.5

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.