Apple Grove substation interconnection queue
1 active project totalling 27 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
27active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-311 | Riverview Solar I | 138 | 69.4 | Hybrid | Withdrawn |
| AI2-369 | Apple Grove 138 kV | 138 | 29.6 | Solar | Withdrawn |
| C01-1027 | Apple Grove 69 kV | 69 | 27 | Hydro | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.