Apple Grove substation interconnection queue
1 active project totaling 27 MW in the PJM queue, plus 2 with terminal status (shown grayed).
Target commercial operation dates as filed run from Jun 2023 to Mar 2029 (3 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-311 | Riverview Solar I | 138 | 69.4 | Hybrid | Withdrawn | Jun 2023 |
| AI2-369 | Apple Grove 138 kV | 138 | 29.6 | Solar | Withdrawn | Jun 2023 |
| C01-1027 | Apple Grove 69 kV | 69 | 27 | Hydro | Active | Mar 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Apple Grove (AEP, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Mason County, WV
- Mountaineer: 3 active, 66 MW of 4 filed
- Sporn South-Leon: 1 active, 60 MW of 2 filed
- Sporn: none active of 2 filed
Other PJM queue substations in Franklin County, OH
- Cole: 2 active, 144 MW of 3 filed
- Cole Road: 1 active, 40 MW of 2 filed
- City of Columbus: 1 active, 7 MW of 3 filed
- Hayden: none active of 3 filed
- Bixby: none active of 2 filed