Sporn South-Leon substation interconnection queue
1 active project totaling 60 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Sporn South-Leon as the point of interconnection, all in Mason County, WV.
Target commercial operation dates as filed run from Dec 2026 to Sep 2028 (2 filings). 1 active filing targets a date after November 27, 2026.
1active projects
60active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-291 | New Haven Solar | 138 | 60 | Solar | Engineering and Procurement | Sep 2028 |
| AI2-304 | Sporn South-Leon 138 kV | 138 | 36.2 | Solar | Withdrawn | Dec 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Mason County, WV
- Mountaineer: 3 active, 66 MW of 4 filed
- Apple Grove: 1 active, 27 MW of 3 filed
- Sporn: none active of 2 filed