Sporn South-Leon substation interconnection queue

1 active project totaling 60 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Sporn South-Leon as the point of interconnection, all in Mason County, WV.

Target commercial operation dates as filed run from Dec 2026 to Sep 2028 (2 filings). 1 active filing targets a date after November 27, 2026.

1active projects
60active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF2-291 New Haven Solar 138 60 Solar Engineering and Procurement Sep 2028
AI2-304 Sporn South-Leon 138 kV 138 36.2 Solar Withdrawn Dec 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Mason County, WV

All 11 PJM queue filings in Mason County, WV.