Mason, WV interconnection queue
3 active projects totalling 90 MW in the PJM queue, plus 7 with terminal status (shown greyed).
3active projects
90active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| N41 | Mountaineer 765kV | 765 | 1,200 | Coal | Withdrawn |
| AG1-311 | Riverview Solar I | 138 | 69.4 | Hybrid | Withdrawn |
| AF2-291 | New Haven Solar | 138 | 60 | Solar | Engineering and Procurement |
| AI2-304 | Sporn South-Leon 138 kV | 138 | 36.2 | Solar | Withdrawn |
| AI2-369 | Apple Grove 138 kV | 138 | 29.6 | Solar | Withdrawn |
| O32 | Mountaineer #1 | 765 | 20 | Coal | In Service |
| AD1-051 | Sporn South 138 kV | 138 | 18.4 | Solar | Withdrawn |
| AG1-162 | Sporn 138 kV | 138 | 14.4 | Solar | Withdrawn |
| C01-1215 | Mountaineer 765 kV | 765 | 10 | Coal | Active |
| AJ1-010 | Racine - Sarah Lane 69 kV | 69 | 7.1 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.