Cole Road substation interconnection queue
1 active project totaling 40 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Cole Road as the point of interconnection, all in Franklin County, OH.
Target commercial operation dates as filed run from Dec 2023 to Apr 2028 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
1active projects
40active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-171 | Cole Road 345 kV | 345 | 40 | Solar | Withdrawn | Dec 2023 |
| C01-1657 | Cole Road 345 kV | 345 | 40 | Solar | Active | Apr 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Franklin County, OH
- Cole: 2 active, 144 MW of 3 filed
- Apple Grove: 1 active, 27 MW of 3 filed
- City of Columbus: 1 active, 7 MW of 3 filed
- Hayden: none active of 3 filed
- Bixby: none active of 2 filed