Substation Scout

City of Columbus substation interconnection queue

1 active project totalling 7 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
7active MW
3total filed
Queue IDProjectkVMWResourceStatus
P44 Columbus Floodwall n/r 7 Other In Service
Q30 City of Columbus n/r 0 Gas Withdrawn
W3-127 City of Columbus 14.4kV 14.4 0 Other Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.