Franklin, OH interconnection queue
5 active projects totalling 218 MW in the PJM queue, plus 15 with terminal status (shown greyed).
5active projects
218active MW
20total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-376 | Beatty 345 kV | 345 | 400 | Battery | Withdrawn |
| AE2-214 | Pleasant Prairie Solar Energy Center | 345 | 120 | Solar | Under Construction |
| AF1-144 | Hayden Run | 345 | 66.9 | Solar | Withdrawn |
| AG1-042 | Hayden 345 kV | 345 | 66.9 | Solar | Withdrawn |
| AH1-318 | Cole 345 kV | 345 | 60 | Battery | Withdrawn |
| AB1-136 | Picway Solar 138kV | 138 | 56 | Solar | Withdrawn |
| AH1-270 | Hayden 345 kV | 345 | 51 | Solar | Withdrawn |
| AG2-498 | Obetz 138 kV | 138 | 50 | Battery | Withdrawn |
| AG2-499 | Bixby 345 kV | 345 | 50 | Battery | Withdrawn |
| AI2-171 | Cole Road 345 kV | 345 | 40 | Solar | Withdrawn |
| C01-1657 | Cole Road 345 kV | 345 | 40 | Solar | Active |
| C01-1027 | Apple Grove 69 kV | 69 | 27 | Hydro | Active |
| AF1-275 | Pleasant Prairie Solar Energy Center | 345 | 24 | Solar | Under Construction |
| P44 | Columbus Floodwall | n/r | 7 | Other | In Service |
| AA1-130 | St. Claire 13kV | 13 | 3 | Gas | Withdrawn |
| AB2-137 | St. Clair 13.2kV | 13.2 | 1 | Gas | Withdrawn |
| Q30 | City of Columbus | n/r | 0 | Gas | Withdrawn |
| V4-071 | Bixby 13.8kV | 13.8 | 0 | Battery | Withdrawn |
| W3-127 | City of Columbus 14.4kV | 14.4 | 0 | Other | Withdrawn |
| Z1-064 | Shannon 13.2kV | 13.2 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.