Sporn substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
Target commercial operation dates as filed run from Dec 2018 to Dec 2022 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC2-048 | Sporn 138kV | 138 | 22.8 | Solar | Withdrawn | Dec 2018 |
| AG1-162 | Sporn 138 kV | 138 | 14.4 | Solar | Withdrawn | Dec 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Meigs County, OH
- Ravenswood-Hemlock: 1 active, 29 MW of 2 filed
Other PJM queue substations in Mason County, WV
- Mountaineer: 3 active, 66 MW of 4 filed
- Sporn South-Leon: 1 active, 60 MW of 2 filed
- Apple Grove: 1 active, 27 MW of 3 filed