Substation Scout

Paradise SP

PJM queue ID U4-036

Paradise SP (U4-036) is listed in the PJM interconnection queue as a 1.9 MW solar project in Gloucester County, NJ. The filing names Gloucester as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of January 4, 2011.

Queue IDU4-036
Project nameParadise SP
Status (as published)In Service
SubstationGloucester
Point of interconnectionGloucester 26.4kV
CountyGloucester
StateNJ
Voltage26.4 kV
Capacity1.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2011-01-04
Source datasetserial

Same substation and county

Gloucester substation: 8 requests in the PJM queue, 3 active totaling 7.1 MW.

Queue IDProjectMWResourceStatus
Z2-062Camden County Energy Recovery Associates3GasIn Service
AC1-010National Park NJ2.2SolarIn Service
R58Camden Cogen Tech55GasWithdrawn
AG1-263Gloucester 230 kV8BatteryWithdrawn
W2-031Gloucester 26kV3.2SolarWithdrawn
V4-013Gloucester 26kV2SolarWithdrawn
AE2-066Gloucester 13 kV1.9SolarWithdrawn

Gloucester, NJ: 88 requests in the PJM queue, 22 active totaling 1,788.6 MW.

A substation with the same name is named in PJM transmission planning materials: Gloucester (PSEG, 6 mentions).

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy5.1
MW capacity1.9
MFO5.1

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first