Esky Solar Project
PJM queue ID AG1-499
Esky Solar Project (AG1-499) is listed in the PJM interconnection queue as a 6 MW solar project in Gloucester County, NJ. The filing names Lambs as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of August 31, 2026.
| Queue ID | AG1-499 |
|---|---|
| Project name | Esky Solar Project |
| Status (as published) | Partially in Service - Under Construction |
| Substation | Lambs |
| Point of interconnection | Lambs 12.47 kV |
| County | Gloucester |
| State | NJ |
| Voltage | 12.5 kV |
| Capacity | 6 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-08-31 |
| Source dataset | serial |
Same substation and county
Gloucester, NJ: 88 requests in the PJM queue, 22 active totaling 1,788.6 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | Status change | n/a | Under Construction → Partially in Service - Under Construction |
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 10 |
| MW capacity | 6 |
| MFO | 10 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.