Substation Scout

NV Energy interconnection queue

Generator interconnection requests to NV Energy’s transmission system in Nevada (and a few in California and Arizona), as of the end of 2025. NV Energy is not in an RTO. The file gives a county for every request but no point of interconnection.

Annual snapshot: requests through December 31, 2025. From Queued Up: 2026 Edition, the interconnection queue data file of Lawrence Berkeley National Laboratory and GridTracker (Interconnection.fyi), published 2026-05, licensed CC BY 4.0, retrieved 2026-11-21. Not refreshed weekly and not part of Queue Wire’s change log; the live queue has moved since. Confirm any request against the transmission provider’s own queue.

505requests in the snapshot
242active (non-terminal)
65,398.4active MW
3states covered

Browse & filter all 505 projects →

Planned substations in this footprint: the Substation Expansion Tracker, Nevada section, new and expanded substations named in Nevada planning records.

By resource category

Categories are normalized for filtering only. The raw data-file value is shown on every project page — NV Energy publishes 6 display groups from many more raw strings.

Data quality

No state reported0
No county reported0
No voltage reported505
0 MW (net change / energy-only)0
Terminal status (hidden by default)263

Top counties by active capacity

Top substations by active capacity

SubstationActive projectsActive MW

All 0 substation pages, by state → Pages are generated for substations with two or more projects and a recognizable name; interface tie-points and filing-note text are excluded, but those projects still appear in browse and on their county pages.

Latest weekly digest: digest_2026_11_23.md