Substation Scout

Lyon, NV interconnection queue

19 active projects totaling 6,294.6 MW in the NV Energy queue, plus 12 with terminal status (shown grayed).

19active projects
6,294.6active MW
31total filed
Queue IDProjectkVMWResourceStatus
25-00432 Not reported n/r 900 Hybrid Active
25-00401 Not reported n/r 500 Hybrid Active
Company ME Not reported n/r 500 Hybrid Suspended
Company OV Not reported n/r 500 Hybrid Suspended
Company OW Not reported n/r 500 Battery Suspended
Company OX Not reported n/r 500 Hybrid Suspended
Company OY Not reported n/r 500 Battery Suspended
Company KU Not reported n/r 400 Hybrid Active
Company LP Not reported n/r 400 Hybrid Active
Company MX Not reported n/r 400 Hybrid Suspended
Company MJ Not reported n/r 300 Hybrid Suspended
Company LM Not reported n/r 230 Other Active
Company LG Not reported n/r 200 Hybrid Active
Company LK Not reported n/r 200 Hybrid Active
Company MC Not reported n/r 200 Hybrid Withdrawn
Company MD Not reported n/r 200 Hybrid Withdrawn
Company MK Not reported n/r 200 Hybrid Suspended
Company NK Not reported n/r 200 Hybrid Withdrawn
Company OD Not reported n/r 200 Hybrid Withdrawn
Company QE Not reported n/r 200 Hybrid Withdrawn
Company LS Not reported n/r 180 Wind Withdrawn
Company MR Not reported n/r 150 Hybrid Withdrawn
Company GY Not reported n/r 100 Solar Withdrawn
Company GZ Not reported n/r 100 Solar Withdrawn
Company HR Not reported n/r 100 Solar Withdrawn
Company GO Not reported n/r 60 Solar Withdrawn
Company QK Not reported n/r 38.5 Other Active
Company IP Not reported n/r 20 Hybrid Withdrawn
25N-SG6 Not reported n/r 20 Hybrid Active
Company KO Not reported n/r 4.8 Other Active
Company MN Not reported n/r 1.3 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with NV Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first