Substation Scout

Story, NV interconnection queue

0 active projects totaling 0 MW in the NV Energy queue, plus 1 with terminal status (shown grayed).

0active projects
0active MW
1total filed
Queue IDProjectkVMWResourceStatus
Company KC Not reported n/r 300 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with NV Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first