Lassen, CA interconnection queue
4 active projects
totaling 1,565 MW in the NV Energy queue, plus 3 with terminal status (shown grayed).
4 active projects
1,565 active MW
7 total filed
Queue ID Project kV MW Resource Status
Company MY
Not reported
n/r
715
Wind
Suspended
25-00381
Not reported
n/r
300
Solar
Active
Company LF
Not reported
n/r
300
Wind
Suspended
Company JY
Not reported
n/r
250
Hybrid
Withdrawn
Company NR
Not reported
n/r
250
Solar
Active
Company EY
Not reported
n/r
200
Wind
Withdrawn
Company EO
Not reported
n/r
140
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with NV Energy before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.