Substation Scout

Eureka, NV interconnection queue

7 active projects totaling 1,078.5 MW in the NV Energy queue, plus 3 with terminal status (shown grayed).

7active projects
1,078.5active MW
10total filed
Queue IDProjectkVMWResourceStatus
Company PV Not reported n/r 500 Battery Withdrawn
Company PP Not reported n/r 350 Hybrid Withdrawn
Company JU Not reported n/r 300 Hybrid Withdrawn
Company NS Not reported n/r 300 Hybrid Suspended
Company LY Not reported n/r 200 Hybrid Suspended
Company LZ Not reported n/r 200 Hybrid Suspended
Company PO Not reported n/r 140 Hybrid Active
Company KK Not reported n/r 100 Hybrid Operational
Company KL Not reported n/r 100 Solar Operational
Company KG Not reported n/r 38.5 Other Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with NV Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first