Mohave, AZ interconnection queue

1 active project totaling 500 MW in the NV Energy queue.

1active projects
500active MW
1total filed
Queue IDProjectkVMWResourceStatus
25-00421 Not reported n/r 500 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with NV Energy before relying on these figures.