Substation Scout

Mineral, NV interconnection queue

5 active projects totaling 1,694.5 MW in the NV Energy queue, plus 3 with terminal status (shown grayed).

5active projects
1,694.5active MW
8total filed
Queue IDProjectkVMWResourceStatus
Company QS Not reported n/r 1,500 Hybrid Withdrawn
Company LU Not reported n/r 700 Hybrid Active
Company LW Not reported n/r 550 Hybrid Suspended
Company LX Not reported n/r 400 Hybrid Suspended
Company KA Not reported n/r 100 Hybrid Withdrawn
25-00391 Not reported n/r 38.5 Other Active
Company HC Not reported n/r 25 Other Withdrawn
Company GW Not reported n/r 6 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with NV Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first