Substation Scout

Esmerelda, NV interconnection queue

1 active project totaling 1,000 MW in the NV Energy queue, plus 2 with terminal status (shown grayed).

1active projects
1,000active MW
3total filed
Queue IDProjectkVMWResourceStatus
25-00394 Not reported n/r 1,000 Hybrid Active
Company JF Not reported n/r 48 Gas Withdrawn
Company HW Not reported n/r 38.5 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with NV Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first