Substation Scout

Elko, NV interconnection queue

0 active projects totaling 0 MW in the NV Energy queue, plus 3 with terminal status (shown grayed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
Company PF Not reported n/r 460 Hybrid Withdrawn
Company MZ Not reported n/r 220 Wind Withdrawn
Company GA Not reported n/r 200 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with NV Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first