Substation Scout

White Pine, NV interconnection queue

17 active projects totaling 7,599.9 MW in the NV Energy queue, plus 9 with terminal status (shown grayed).

17active projects
7,599.9active MW
26total filed
Queue IDProjectkVMWResourceStatus
Company KD Not reported n/r 750 Hybrid Suspended
Company KR Not reported n/r 600 Hybrid Active
Company LV Not reported n/r 600 Hybrid Suspended
Company NQ Not reported n/r 600 Hybrid Suspended
Company NU Not reported n/r 600 Hybrid Suspended
Company NW Not reported n/r 600 Hybrid Suspended
Company NX Not reported n/r 600 Hybrid Suspended
Company KS Not reported n/r 575 Wind Withdrawn
Company MV Not reported n/r 550 Battery Suspended
Company MW Not reported n/r 400 Hybrid Active
Company NB Not reported n/r 350 Hybrid Suspended
Company MA Not reported n/r 300 Hybrid Active
Company MB Not reported n/r 300 Hybrid Active
Company MT Not reported n/r 300 Hybrid Suspended
Company MU Not reported n/r 300 Hybrid Suspended
Company NA Not reported n/r 300 Wind Suspended
Company KW Not reported n/r 250 Hybrid Suspended
Company FK Not reported n/r 200 Hybrid Withdrawn
Company LH Not reported n/r 200 Hybrid Withdrawn
Company LJ Not reported n/r 200 Hybrid Withdrawn
Company PY Not reported n/r 200 Hybrid Withdrawn
Company QD Not reported n/r 200 Hybrid Withdrawn
Company QH Not reported n/r 199.9 Battery Active
Company KX Not reported n/r 175 Solar Withdrawn
Company IT Not reported n/r 120 Hybrid Withdrawn
Company PG Not reported n/r 100 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with NV Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first