Nolan, TX interconnection queue

18 active projects totalling 4,441 MW in the ERCOT queue.

18active projects
4,441active MW
18total filed
Queue IDProjectkVMWResourceStatus
27INR0575 Trailblazer Natural Gas Generation Plant 345 1,026 Gas SS Started, FIS Started, No IA
23INR0008 Harley Hand Solar 345 505.5 Solar SS Completed, FIS Started, No IA
23INR0214 Harley Hand Storage 345 503.4 Battery SS Completed, FIS Started, No IA
29INR0325 Sweetwater 4 Repower 345 421.2 Wind SS Completed, FIS Started, No IA
27INR0578 Trailblazer Solar 345 323 Solar SS Completed, FIS Started, No IA
27INR0218 Themisto Solar 345 301.4 Solar SS Completed, FIS Started, No IA
27INR0576 Trailblazer BESS 345 262 Battery SS Completed, FIS Started, No IA
26INR0625 Buffalo Gap 2 Wind Repower 138 231.5 Wind SS Completed, FIS Completed, IA
23INR0473 Sepanta Solar 138 218 Solar SS Completed, FIS Started, No IA
28INR0386 Sagebrush Wind 345 200.5 Wind SS Completed, FIS Started, No IA
18INR0031 Maryneal Wind 345 182.4 Wind SS Completed, FIS Completed, IA
28INR0349 Jaguarundi Energy Storage 138 152 Battery SS Completed, FIS Started, No IA
28INR0504 Sweetwater 5 Repower n/r 79.1 Wind SS Completed, FIS Started, No IA
26INR0297 Buzzi Maryneal Wind Project n/r 18 Wind SS Completed, FIS Started, No IA
17INR0068 Sweetwater 2 repower 345 7.3 Wind SS Completed, FIS Completed, IA
17INR0069 Trent repower 138 6.4 Wind SS Completed, FIS Completed, IA
18INR0073 Sweetwater 1 repower 345 3 Wind SS Completed, FIS Completed, IA
24INR0627 Champion Wind Repower n/r 0.3 Wind SS Completed, FIS Completed, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.