Sepanta Solar
ERCOT queue ID 23INR0473
Sepanta Solar (23INR0473) is listed in the ERCOT interconnection queue as a 218 MW solar project in Nolan County, TX. The filing names ESKOTA_9 (PSS/E BUS #, Station Name: ESKOTA_8, kV: ) Property is adjacent (West) to the Oncor Sweetwater Eskota Switch #. POI would simply be on the other side of the fence of the switch. as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 18, 2029. It records the screening study as complete on January 13, 2023.
| Queue ID | 23INR0473 |
|---|---|
| Project name | Sepanta Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | ESKOTA_9 (PSS/E BUS #, Station Name: ESKOTA_8, kV: ) Property is adjacent (West) to the Oncor Sweetwater Eskota Switch #. POI would simply be on the other side of the fence of the switch. |
| Point of interconnection | 10198 ESKOTA_9 138kV (PSS/E BUS #10198, Station Name: ESKOTA_8, kV: 138 kV) Property is adjacent (West) to the Oncor Sweetwater Eskota Switch #10198. POI would simply be on the other side of the fence of the switch. |
| County | Nolan |
| State | TX |
| Voltage | 138 kV |
| Capacity | 218 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-09-18 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Nolan, TX: 18 requests in the ERCOT queue, 18 active totaling 4,440.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | BREG - Belgian Renewable Energy Group |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2023-01-13 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.