Substation Scout

Sepanta Solar

ERCOT queue ID 23INR0473

Sepanta Solar (23INR0473) is listed in the ERCOT interconnection queue as a 218 MW solar project in Nolan County, TX. The filing names ESKOTA_9 (PSS/E BUS #, Station Name: ESKOTA_8, kV: ) Property is adjacent (West) to the Oncor Sweetwater Eskota Switch #. POI would simply be on the other side of the fence of the switch. as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 18, 2029. It records the screening study as complete on January 13, 2023.

Queue ID23INR0473
Project nameSepanta Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationESKOTA_9 (PSS/E BUS #, Station Name: ESKOTA_8, kV: ) Property is adjacent (West) to the Oncor Sweetwater Eskota Switch #. POI would simply be on the other side of the fence of the switch.
Point of interconnection10198 ESKOTA_9 138kV (PSS/E BUS #10198, Station Name: ESKOTA_8, kV: 138 kV) Property is adjacent (West) to the Oncor Sweetwater Eskota Switch #10198. POI would simply be on the other side of the fence of the switch.
CountyNolan
StateTX
Voltage138 kV
Capacity218 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-09-18
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Nolan, TX: 18 requests in the ERCOT queue, 18 active totaling 4,440.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBREG - Belgian Renewable Energy Group
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2023-01-13
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first