Substation Scout

Sweetwater 4 Repower

ERCOT queue ID 29INR0325

Sweetwater 4 Repower (29INR0325) is listed in the ERCOT interconnection queue as a 421.2 MW wind project in Nolan County, TX. The filing names <> <L_BITTCR5_1Y> <> as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of February 1, 2029. It records the screening study as complete on July 8, 2026.

Queue ID29INR0325
Project nameSweetwater 4 Repower
Status (as published)SS Completed, FIS Started, No IA
Substation<> <L_BITTCR5_1Y> <>
Point of interconnection<71050> <L_BITTCR5_1Y> <345kV>
CountyNolan
StateTX
Voltage345 kV
Capacity421.2 MW
Resource (as published)WIN/WT
Resource categoryWind (normalized for filtering)
Target commercial operation2029-02-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Nolan, TX: 18 requests in the ERCOT queue, 18 active totaling 4,440.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entitySweetwater Wind 4 LLC
CDR reporting zoneWEST
Fuel codeWIN
Technology codeWT
Screening study complete2026-07-08
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first