Trailblazer BESS

ERCOT queue ID 27INR0576

Trailblazer BESS (27INR0576) is listed in the ERCOT interconnection queue as a 262 MW battery project in Nolan County, TX. The filing names Sweetwater East Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 12, 2027. It records the screening study as complete on June 15, 2026.

Queue ID27INR0576
Project nameTrailblazer BESS
Status (as published)SS Completed, FIS Started, No IA
SubstationSweetwater East Switch
Point of interconnection11420 Sweetwater East Switch 345 kV
CountyNolan
StateTX
Voltage345 kV
Capacity262 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-12-12
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Sweetwater East Switch substation: 2 requests in the ERCOT queue, 2 active totaling 1,288 MW.

Queue IDProjectMWResourceStatus
27INR0575Trailblazer Natural Gas Generation Plant1,026GasSS Completed, FIS Started, No IA

Nolan, TX: 18 requests in the ERCOT queue, 18 active totaling 4,440.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityTrailblazer Infrastructure LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Screening study complete2026-06-15

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.