Trailblazer Natural Gas Generation Plant

ERCOT queue ID 27INR0575

Trailblazer Natural Gas Generation Plant (27INR0575) is listed in the ERCOT interconnection queue as a 1,026 MW gas project in Nolan County, TX. The filing names Sweetwater East Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 12, 2027. It records the screening study as complete on August 6, 2026.

Queue ID27INR0575
Project nameTrailblazer Natural Gas Generation Plant
Status (as published)SS Completed, FIS Started, No IA
SubstationSweetwater East Switch
Point of interconnection11420 Sweetwater East Switch 345 kV
CountyNolan
StateTX
Voltage345 kV
Capacity1,026 MW
Resource (as published)GAS/GT
Resource categoryGas (normalized for filtering)
Target commercial operation2027-12-12
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Sweetwater East Switch substation: 2 requests in the ERCOT queue, 2 active totaling 1,288 MW.

Queue IDProjectMWResourceStatus
27INR0576Trailblazer BESS262BatterySS Completed, FIS Started, No IA

Nolan, TX: 18 requests in the ERCOT queue, 18 active totaling 4,440.8 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-07 Status change n/a SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA

Full change log →

Additional filed fields

Interconnecting entityTrailblazer Infrastructure LLC
CDR reporting zoneWEST
Fuel codeGAS
Technology codeGT
Screening study complete2026-08-06

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.