Substation Scout

Trent repower

ERCOT queue ID 17INR0069

Trent repower (17INR0069) is listed in the ERCOT interconnection queue as a 6.4 MW wind project in Nolan County, TX. The filing names Eskota as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of January 1, 2026. It records the screening study as complete on November 28, 2017, the full interconnection study as approved on March 1, 2018 and the interconnection agreement as signed on October 19, 2018.

Queue ID17INR0069
Project nameTrent repower
Status (as published)SS Completed, FIS Completed, IA
SubstationEskota
Point of interconnection1338 Eskota 138kV
CountyNolan
StateTX
Voltage138 kV
Capacity6.4 MW
Resource (as published)WIN/WT
Resource categoryWind (normalized for filtering)
Target commercial operation2026-01-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Nolan, TX: 18 requests in the ERCOT queue, 18 active totaling 4,440.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityTRENT WIND FARM LLC
CDR reporting zoneWEST
Fuel codeWIN
Technology codeWT
Interconnection agreement signed2018-10-19
Screening study complete2017-11-28
Full interconnection study approved2018-03-01
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first