Themisto Solar
ERCOT queue ID 27INR0218
Themisto Solar (27INR0218) is listed in the ERCOT interconnection queue as a 301.2 MW solar project in Nolan County, TX. The filing names Tap Sweetwater East Switch – Oak Spring Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 30, 2029. It records the screening study as complete on May 24, 2024.
| Queue ID | 27INR0218 |
|---|---|
| Project name | Themisto Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Sweetwater East Switch – Oak Spring Switch |
| Point of interconnection | Tap 345kV Sweetwater East Switch 11420 – Oak Spring Switch 10105 |
| County | Nolan |
| State | TX |
| Voltage | 345 kV |
| Capacity | 301.2 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-06-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Nolan, TX: 18 requests in the ERCOT queue, 18 active totaling 4,440.8 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Capacity revised | −0.2 | SS Completed, FIS Started, No IA → SS Completed, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | Themisto Solar, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2024-05-24 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.