ERCOT queue ID 29INR0279

Tierra Loma Solar (29INR0279) is listed in the ERCOT interconnection queue as a 250 MW solar project in Crane County, TX. The filing names Tap # ROCK DRAW - # NORTH MCCAMEY ckt 1 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 1, 2029. It records the screening study as complete on May 15, 2026.

Queue ID29INR0279
Project nameTierra Loma Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap # ROCK DRAW - # NORTH MCCAMEY ckt 1
Point of interconnectionTap 345 kV #18668 ROCK DRAW - #76000 NORTH MCCAMEY ckt 1
CountyCrane
StateTX
Voltage345 kV
Capacity250 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-09-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap # ROCK DRAW - # NORTH MCCAMEY ckt 1 substation: 2 requests in the ERCOT queue, 2 active totaling 450 MW.

Queue IDProjectMWResourceStatus
29INR0280Tierra Loma Storage200BatterySS Completed, FIS Started, No IA

Crane, TX: 14 requests in the ERCOT queue, 13 active totaling 2,944.5 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityTierra Loma Solar, LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2026-05-15
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first