BRP Ampato BESS

ERCOT queue ID 23INR0074

BRP Ampato BESS (23INR0074) is listed in the ERCOT interconnection queue as a 121.6 MW battery project in Crane County, TX. The filing names NS Crane Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 1, 2027. It records the screening study as complete on October 28, 2020.

Queue ID23INR0074
Project nameBRP Ampato BESS
Status (as published)SS Completed, FIS Started, No IA
SubstationNS Crane Switch
Point of interconnection10002 NS Crane Switch 138kV
CountyCrane
StateTX
Voltage138 kV
Capacity121.6 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-12-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Crane, TX: 14 requests in the ERCOT queue, 13 active totaling 2,944.5 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBRP Ampato BESS LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Screening study complete2020-10-28

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.